Case Studies

Up Fitness Project in Paddington:

We were instructed by Heron Project Management limited that they had a client in desperate need of a Commercial electrical Contractor. Taking into account their needs and desperation to get this project done I supplied them with a transparent quotation the very same day which they accepted on the Friday. By the Monday Morning our team worked over the weekend to load out a van with a full fit out from the office to be driven into London. We put a team of between 5-10 electricians at all times over the multiple floors to deliver electrical installation, lighting design, electrical containment, Fire alarm, data, door entry all working drawings, contract management and OandM manual. We did this all on time and on budget with some cost savings and a better lighting scheme than the proposed one

Calvin Klein

We were instructed after winning a tender bit for Calvin Klein Westfield. The project was a 10 week fit out in which time we Installed all containment, electrical services,Fire alarm, VESDA system, music system, Data and all as fitted drawings. This project was completed both on time and on budget.